Old Dog Manufacturing
OLD DOG
MANUFACTURING
START AN ELECTRICAL RFQ
+
+
+
+
ELECTRICAL/ELECTRICAL RFQ
ELECTRICAL RFQ

ONE RFQ.
ONE POINT OF CONTACT.

Assemblies, interconnect, control products, installation hardware or a whole electrical BOM — tell us what you are sourcing and we will ask only the questions that apply to it. Drawing, schematic, BOM or sample: send whatever you have.

WHAT WE REVIEW
WIRE / CONNECTORS / TESTING / SUPPLY
TYPICAL RESPONSE2–3 BUSINESS DAYS
BUILD-TO-PRINT OR NOT
Quote from your drawing as-is, or describe the application and we will help define it.
ONLY WHAT APPLIES
Sourcing a switch? You will not be asked wire-harness questions.
NO DUPLICATE ENTRY
If it is on the drawing or BOM, answer "per drawing" and move on.
SUPPLY + RELEASES
Kitting, labeling, traceability and scheduled releases shape the quote.
ELECTRICAL RFQ INTAKEELECTRICAL / {{ pathLabel }}
PROJECT INFORMATIONREQUIRED
— {{ projectError }}
WHAT ARE YOU REQUESTING?REQUIRED
— {{ requestTypeError }}
THE REST OF THE FORM ADAPTS TO THIS ANSWER — ONLY RELEVANT QUESTIONS ARE SHOWN.
IS THIS BUILD-TO-PRINT OR APPLICATION-DRIVEN?REQUIRED
{{ c.label }}
— {{ buildBasisError }}
UPLOAD WHAT YOU HAVE{{ filesTag }}
UP TO 20 FILES — 200 MB EACH
Upload any drawings, schematics, wire lists, BOMs, connector callouts, photographs or specifications that help define the requirement.
ELECTRICAL DOCUMENTATION{{ badgeFiles }}
{{ promptFiles }}
.PDF / .JPG / .PNG / .XLS / .XLSX / .CSV / .STEP / .STP / .DXF / .ZIP · ZIPS ARE MALWARE-SCANNED
{{ f.name }}
{{ f.ext }}{{ f.size }}{{ f.status }}
DRAWING, SCHEMATIC, WIRE LIST, BOM, CONNECTOR SPECIFICATIONS, PHOTOGRAPHS OF AN EXISTING ASSEMBLY, TEST OR INSPECTION REQUIREMENTS.
— {{ filesError }}
DO YOU HAVE A COMPLETE DRAWING OR SPECIFICATION?REQUIRED
{{ c.label }}
— {{ docStatusError }}
Understood — we will not require the specification details below. Answer what you know, mark the rest as assistance required, and our team will work through the gaps with you.
QUANTITY + USAGEREQUIRED
— {{ qtyError }}
ESTIMATED ANNUAL USAGEOPTIONAL
REQUIREMENT TYPEREQUIRED
— {{ requirementError }}
WIRE + CABLEREQUIRED
ARE THE WIRE / CABLE REQUIREMENTS SPECIFIED?
{{ c.label }}
— {{ wireStatusError }}
SKIP ANYTHING ALREADY DEFINED IN THE DRAWING OR BOM — NO NEED TO RETYPE IT.
CONNECTORS + TERMINATIONSREQUIRED
ARE THE CONNECTORS AND TERMINALS SPECIFIED?
{{ c.label }}
— {{ connectorStatusError }}
TERMINATION TYPESSELECT ALL THAT APPLY
{{ c.label }}
PINOUT / WIRING DEFINITIONREQUIRED
{{ c.label }}
— {{ pinoutError }}
COMPONENT REQUIREMENTREQUIRED
A PART NUMBER IS IDEAL, BUT AN APPLICATION DESCRIPTION IS ENOUGH TO START.
— {{ componentDescriptionError }}
BOM + KITTINGREQUIRED
SOURCING + ALTERNATESREQUIRED
ARE EQUIVALENT / ALTERNATE PARTS ACCEPTABLE?REQUIRED
— {{ alternateError }}
TESTING + INSPECTIONOPTIONAL
SELECT ALL THAT APPLY.
WHAT ELECTRICAL TESTING IS REQUIRED?
{{ c.label }}
REFERENCING AN UPLOADED DOCUMENT IS ENOUGH.
INSPECTION + DOCUMENTATIONSELECT ALL THAT APPLY
{{ c.label }}
IDENTIFICATION + SUPPLYOPTIONAL
LABELING + IDENTIFICATIONSELECT ALL THAT APPLY
{{ c.label }}
PACKAGINGOPTIONAL
KITTING + VALUE-ADDED SUPPLYSELECT ALL THAT APPLY
{{ c.label }}
TRACEABILITY + DOCUMENTATIONSELECT ALL THAT APPLY
{{ c.label }}
DELIVERYOPTIONAL
REQUIRED DELIVERYOPTIONAL
A TARGET DATE HELPS US UNDERSTAND URGENCY — IT IS NOT A CONFIRMED DELIVERY DATE.
RELEASE / SHIPMENT PREFERENCEOPTIONAL
CURRENT SOURCINGOPTIONAL
HOW IS THIS SOURCED TODAY?OPTIONAL
ADDITIONAL INFORMATIONOPTIONAL
CONTACT INFORMATION
— {{ firstNameError }}
— {{ lastNameError }}
— {{ emailError }}
— {{ phoneError }}
— {{ zipError }}
RFQ COMMUNICATIONREQUIRED
RFQ Communication Privacy Policy
— {{ consentError }}
REVIEW & SEND
{{ row.label }}{{ row.value }}
{{ fieldNotice }}
{{ failureHeadline }}
Nothing has been sent yet. Please try again — everything you entered is still here.
{{ failureDetail }}
We review the documentation, component requirements, testing and supply needs, then follow up with questions or a quotation path.
CONFIRMATION
PREVIEW MODE — NOT SUBMITTED

ELECTRICAL RFQ RECEIVED.

We received your electrical requirement and any supporting files. Our team will review the documentation and sourcing requirements and follow up with the next step.

Your request was received. Confirmation email delivery is pending.

Your request was received successfully. We were unable to send the confirmation email, but everything is safely in our system.

REQUEST REFERENCE{{ resultId }}
{{ emailRowLabel }}{{ resultEmail }}
FILES RECEIVED
{{ f }}
WHAT HAPPENS NEXT
REVIEW
We review the drawing, schematic, BOM and component requirements.
FILL THE GAPS
If something is incomplete, we identify what still needs to be defined.
QUOTE
Once the requirement is clear, we move toward sourcing and quotation.
RETURN TO ELECTRICAL